News-Releases
News Releases

7,000 m Drill Program on the Yenipazar Au-Ag-Cu-Pb-Zn Property, Turkey

06/22/2006

Vancouver, British Columbia, Canada. Aldridge Minerals Inc. ("Aldridge") (Frankfurt WKN: A0CAPB, TSX.V: AGM) is pleased to announce that it has finalized all preparations for a 7,000 m reverse circulation ("RC") drill program at the polymetallic Yenipazar project in central Turkey (the "Yenipazar Project"). Aldridge anticipates that the RC drill program will commence sometime in late June, 2006.

As per Aldridge's National Instrument 43-101 ("NI 43-101") compliant Technical Report dated January 15, 2006, the inferred resources reported within the optimized open pit shell is 4,705,000 tonnes @ 1.66 g/t Au, 35.6 g/t Ag, 0.45 % Cu, 1.44 % Pb and 1.64 % Zn. Aldridge believes the metamorphic nature and resulting coarse grain size will facilitate the extraction of ore minerals. Aldridge will also conduct experiments for gravitational pre-concentration in the Yenipazar Project.

Aldridge has also completed a geophysical survey (IP) on several locations within a radius of 12 km from the inferred resource and identified chargeability anomalies that may be related to further sulphide mineralization.

The forthcoming drill program will be conducted on a 40 x 40 m infill grid to outline an indicated resource and to test the open northern and southern extensions of the ore body. Several holes will be drilled on untested geophysical anomalies. Recovered RC-pulps shall be used for metallurgical test work. All results shall be summarized in a NI 43-101 compliant, independent Preliminary Economic Analysis for development of the Yenipazar Project.

Dr. Martin S. Oczlon, PhD Geo, a director of Aldridge and a Qualified Person as such term is defined in NI 43-101, has reviewed and verified the technical content of this release.

Aldridge is active in the exploration and development of gold and base metal projects in Turkey.

On behalf of the Board of Directors
Dr. Hikmet Akin

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

For further information please contact:
Aldridge Minerals Inc.
Hikmet Akin
President, Director
Tel. +1 (306) 955-4741
Suite 204, 3540 West 41st Avenue
Vancouver, BC, V6N 3E6, Canada


www.aldridgeminerals.com

AXINO AG
Silberburgstrasse 112
D-70176 Stuttgart
Tel. +49 (711) 25 35 92-30
Fax +49 (711) 25 35 92-33


www.axino.de

TSX-V: AGM 0.24 +0.01 +2.17% Volume: 6,586 April 25, 2017

Downloads

Date Download
November 29, 2016 Financial Statements - Q4 2016 699 KB
November 29, 2016 Q4 2016 MD&A 826 KB
June 11, 2012 Yenipazar Plan Map 1.21 MB
March 22, 2012 Corporate Presentation 1.38 MB